Earlier we learned the characteristics of network cabinets. In this article, we mainly understand the installation precautions of it.

 

It is understood that the network cabinet  has evolved from the entire panel structure in the past to a box and plug-in structure with a certain size series. The assembling and arranging methods of the plug-in boxes and plug-ins are divided into two types: horizontal arrangement and vertical arrangement. Network cabinet materials generally use thin steel plates, steel profiles of various cross-sectional shapes, aluminum profiles and various engineering plastics. In addition to welding and screw connection, the frame of the network cabinet also uses the bonding process.

 


Main installation matters of network cabinet

With the relevant dimensions of the cabinet, check the shape of the device to ensure it matches the selected bracket. A sturdy cabinet can hold up to 450 pounds, so check the tools used to take out the equipment, such as a lift door or trolley. A good cabinet is equipped with wheels underneath, so you only need to install the equipment and push the cabinet to a suitable place.

 

Measure the size of the room and the height of the ceiling, doors, and elevator through which the cabinet passes. In addition, considering the multiple types of equipment in the cabinet, make sure to place the cabinet close to the power supply, network cable socket, and communication socket.

 

Check the opening angle of the cabinet door when opening and closing the cabinet. The standard cabinet door opens on the right and the door axis on the left. The opposite is not ruled out. All doors and side panels should be easily opened for maintenance.

 

When you want to install the equipment cabinet into an existing cabinet group, you can arrange the cabinets next to each other in a row, which is safe and tidy. For some reasons, some cabinet groups cannot be increased, or only a few accessories can be added. The best cabinet group model should have sufficient expansibility, with all necessary hardware, you can remove the side panels of the cabinet, and use screws to connect the cabinets to each other in a row.

 


Network cabinet installation

The cabinet installation process is divided into the following steps: cabinet installation plan, preparation before cabinet installation, and cabinet debugging. The following details the installation of network cabinets:

 

Plan the space before installing the cabinet. For easy heat dissipation and protection facilities, the distance between the front and back of the cabinet and the wall or other facilities should not be less than 0.8 meters, and the net height of the equipment room should not be less than 2.5 meters.

 

Before installation, the site must be correct without errors, otherwise rework will be caused. Follow the unpacking guide to disassemble the cabinet and the cabinet accessories packaging wooden box.

 

After the cabinet is fixed, you can directly install the cabinet accessories. Place the cabinet in the planned position, confirm the front and back of the cabinet, and aim the cabinet feet to the corresponding anchor positioning marks.

 

Place the spirit level on two sides of the simplest top of the cabinet perpendicular to each other to check the level of the cabinet. Turn the screw on the foundation foot to adjust the height of the cabinet to make the cabinet level, and then lock the locking screw cap on the cabinet foot so that the locking screw cap is tightly attached to the bottom of the cabinet.

 

For more quotation information of network cabinets, please visit the company's website for details.